Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Shijiazhuang Yonghongyun Machinery Equipment Co

TSJ-2000 Engineering Drilling Rig TSJ Water Drilling Rig ZLJ Coal Mine Pit Dr...

sell
  • There is no classification
contact
  • Contact:郝经理
  • Phone:0133-15989961
  • Email:yonghongyun06@163.com
  • fax:0311-85431963
search
 
link
  • There is no link yet
home > sell > Crawler type electromechanical pile driver
Crawler type electromechanical pile driver
products: Views:11Crawler type electromechanical pile driver 
brand: 永宏运
额定电压(v): 380
电机(千瓦): 15-30
最大深度(m): 3-5
price: 10000.00元/台
MOQ: 1 台
Total supply: 10000 台
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2017-03-09 11:30
 
Details

1. Purpose of crawler pile driver This is a type of electromechanical pile driver that can generate electricity by itself and external power supply. It is suitable for house foundation construction, highway foundation reinforcement, high-speed railway power facilities, wind power plants, solar photovoltaic power generation Plant soft foundation soil treatment and reinforcement and other piling projects. Features of the - type electromechanical dual-purpose crawler pile driver: reasonable design, beautiful appearance, simple operation, two product options for forward and backward movement and left and right rotation. It has the characteristics of fast positioning, fast piling, fast piling, and high efficiency. It can also be customized according to customer requirements. When the diagonal brace is rotating, you should pay attention to observe whether there is any swing. If there is any swing, replace the guide copper sleeve or copper nut in the diagonal brace in time.
This machine operates using a reducer. It is necessary to observe whether the internal lubricating oil reaches the specified oil level. If it is insufficient, add - (-) mechanical oil diagonal brace adjustment mechanism should add # oil (please refer to crawler pile driver hydraulic oil , lubricating oil usage details) The oil level is under the breathable plug hole when working.
The control valve of the oil tank and pump of the hydraulic system should be kept clean. The first oil change time is 1 hour, and every hour thereafter. Every time the oil is changed, the oil tank must be cleaned carefully to prevent dirt from entering the oil.
The oil nozzles installed on the pulley block bearings and other rotating parts of the pile frame should be filled with calcium-based lubricating grease on time.
The track chain should be cleaned every working day to ensure that the track chain is clean and operating normally.
The power head slip pulley nylon sleeve and main winch copper sleeve should be replaced in time if they are worn.
Wire ropes should be inspected, maintained and used in accordance with relevant national standards.
The supporting mechanism shall be used and maintained according to the requirements of the supporting instructions.
Overall dimensions
**
Vehicle weight

Engine power (horsepower)

Engine motor (kilowatt)
< br/> Maximum depth

Maximum rotation angle

Maximum diameter of rotating rod

Rated voltage

Motor (kW)

Walking speed (miles)

Request for quotation
A total of0articles  Related Comments: